Do You Need a Permit for a Driveway in Monterey County?
Usually not a building permit, if the driveway sits at grade. Under the state’s exempt list, a driveway up to 30 inches above adjacent grade needs no building permit. Two more conditions: no basement or story below it, and it is not part of an accessible route.
The end that meets the street is different. The approach, the curb cut and the apron all lie in the public right of way. Work there needs an encroachment permit from the road’s owner: Monterey County, the city, or Caltrans. On most jobs, that encroachment permit is the driveway permit that matters.
Aguilar and Sons Construction builds new and replacement concrete driveways across the Monterey Bay area, approach included. We are a licensed general building contractor based in Salinas.
Does a concrete driveway need a building permit?
Most new and replaced driveways at grade fall under that state exemption. It is a building permit rule only, so the street, grading and trees still have their own rules. A driveway raised more than 30 inches, or built over a basement or story below, falls outside it.
The test looks only at height and what lies underneath. Paver driveways start from the same test as poured concrete. Carmel-by-the-Sea is the clear exception, covered below.
Who issues a driveway approach or curb cut permit?
The approach is where a driveway crosses the sidewalk or shoulder to meet the street. The curb cut is the dip in the curb that lets cars in.
In unincorporated Monterey County, the permit comes from the Encroachment Permits section of Housing and Community Development (HCD). The section issues permits for construction in all County rights of way, and its list of encroachments names driveways. The County’s engineering staff also review plans for new or rebuilt drive approaches.
On a County road in Prunedale, Carmel Valley or Corral de Tierra, that is the office. Pebble Beach is the exception: the roads in the Del Monte Forest are privately owned, not County roads, so ask the road’s owner what work at the road needs before anything gets cut. Building and planning permits there still go through the County, and our Pebble Beach page covers the forest’s own standards. If the road out front belongs to someone else, ask HCD who issues the permit there.
A house inside a city goes to that city instead. Marina, Seaside and Carmel-by-the-Sea each name installing or modifying a driveway approach as permit work.
| Where the driveway is | Who issues the permit for work in the street | What else can trigger review |
|---|---|---|
| Unincorporated county: Prunedale, Carmel Valley, Corral de Tierra | HCD’s Encroachment Permits section, for County roads | Grading, protected trees, Design Approval, Coastal Zone review |
| Pebble Beach (Del Monte Forest) | The road’s private owner, since these are not County roads | County building and planning review, Coastal Zone review |
| Salinas | The City, on its encroachment permit application | Inspections of base and subgrade, forms and rebar, and the concrete |
| Monterey | The City’s permit center, on its own Encroachment Permit Application | ”Check with the Building and Safety Division before starting any project” |
| Seaside | The City’s Public Works Department | Sidewalk, curb or gutter work needs one too |
| Marina | City Public Works | Repairing an approach needs one too |
| Carmel-by-the-Sea | The City, on its encroachment permit | A building permit for replacements, site coverage, the 2-inch root and limb rule |
| Pacific Grove | The Director of Public Works | A planning permit for “even changes to paving” |
| A state highway, such as Highway 68 or Highway 1 | Caltrans | Fees vary by the type of encroachment |
Santa Cruz, Capitola, Aptos and Watsonville sit in Santa Cruz County, which has its own county and city offices. This guide covers Monterey County only.
When do you need a Caltrans encroachment permit?
When the driveway meets a state highway, such as Highway 68 or Highway 1. Caltrans says a permit must be obtained for encroachments within, under or over the State highway right of way. Its list of that work names driveways.
Applications go in on the Standard Encroachment Permit Application. Caltrans says fees vary by the type of encroachment and the staff hours to review and inspect it.
Is a driveway widening permit any different?
A wider driveway at the street means a wider approach and curb cut. That counts as modifying the approach, so the encroachment permit applies.
Widening on the lot side only can still bring review. An RV pad or side-yard extension adds paving, which Carmel-by-the-Sea and Pacific Grove both review. A longer cut in the unincorporated county can bring in the grading rules.
Can grading or trees add a permit to a driveway job?
They can, in the unincorporated county. Grading for a driveway longer than 50 feet calls for a County construction permit. So does moving more than 100 cubic yards of earth, counting cut and fill together. Grading on ground steeper than 30 percent triggers one as well, and in North County the line is 25 percent.
The County also requires a Tree Removal Permit before a protected tree is removed or heavily trimmed. If a new or wider driveway runs near a big tree, ask whether it is protected first.
Design review can apply even with no building permit. In the County’s words, “projects which do not require a building permit may require Design Approval.” Exempt work still has to meet setbacks, so the County tells owners to consult a Department planner.
Along the coast, projects that need a building permit go to the County’s Coastal Planning staff. Those staff decide if a Coastal Permit is required, so a coastal parcel should ask early.
How do Carmel-by-the-Sea and Pacific Grove handle driveways?
Carmel-by-the-Sea sets a stricter bar than the state list. Its planning FAQ says most construction work, driveway replacements included, requires a building permit. Driveways count as site coverage there, and most site coverage changes require Planning approval. The City also keeps its own application for a Driveway Replacement Permit.
Carmel protects trees on construction sites: removing a limb or root 2 inches or more in diameter takes a permit. Widening into a tree’s root zone can hit roots that size. Check with the City before the old slab comes out.
In Pacific Grove, exterior changes need a planning permit, and the City’s FAQ counts “even changes to paving.” So a new or reshaped driveway there can need one. For work in the street, the City’s code says encroachment permits are issued by the Director of Public Works.
What happens once the street permit is issued?
The County’s encroachment permit conditions call for at least 48 hours notice of intent to work. Weekends and holidays do not count toward that notice.
The City of Salinas inspects work in its right of way. Its encroachment form’s checklist covers the base and subgrade, the forms and rebar, and the concrete. Base prep, forming, steel and finishing are all done by our own crew on the driveways we pour.
What should you do before a driveway job starts?
Two facts decide most of this: whether the house is inside a city, and who owns the road out front. Get both, then ask that office about grading, trees, design review and the Coastal Zone.
To see how we build the slab itself, visit our concrete driveways page. Our concrete contractor page covers the rest of our flatwork. Cost has its own guide: concrete driveway cost in California. Call or text (831) 262-9943 to set up a free estimate.
Nothing in this guide is legal advice. Each rule here belongs to the office that covers your address, so confirm it there.